Condensed from a real completed-run analysis
Primary lever identified: dosing verification
Cultivar A · first tracked run · 90 plants · 24 lights
2.55 lb/lightbaseline established
High confidence in recorded miss
Possible contributor, not causal proof
A missed dosing channel may have constrained early flower.
- An operator note recorded that Part A dosing was off for the first 10 days after flip.
- Density finished at 3/10 while potency, drying, and trim execution remained solid.
- More than 750 later feed events averaged roughly 32% above the saved recipe target.
What weakens the conclusion: This was the first tracked run, and early heat, VPD, and a new propagation source overlapped the dosing interruption.
Recommended next move
Add a day-of-flip dosing checklist. Modeled opportunity: approximately 4-6 lb if the interruption materially constrained this run. Directional scenario, not a forecast.